Tank Strapping Tables: Level-to-Volume Without Mistakes

Strap vertical tanks with pi/4 D^2 h, horizontal tanks with the fill-factor table, add 2:1 SE heads, and time transfers with t = V/Q.

Tanks

Inventory accuracy lives in the strapping table. Vertical tanks scale linearly with level; horizontal cylinders do not, so half level is half volume only at exactly half full. Add dished heads separately at 0.131 D^3 each for 2:1 semi-elliptical heads, and plan transfers with fill time t = V/Q: 15.7 m3 at 36 m3/h takes 26.2 minutes.

Formulas

Vertical shell

V = (pi/4)D^2 h

Add heads separately.

SE head

V_head = 0.131 D^3

Per 2:1 semi-elliptical head.

Fill time

t = V/Q

Constant-rate transfers.

Worked example

DN2000 vertical x 5 m

Inputs: D 2; h 5.

Calculation: Shell 15.71 m3; plus two heads 2.10 m3.

Lesson:

Frequently asked questions

Vertical tank formula?

Area times level; add heads separately.

Why is half level not half volume in horizontal tanks?

Level fraction is nonlinear; use the strapping table or segment formula.

How much do dished heads add?

About 0.131 D^3 per 2:1 SE head.